Library Facilities

PRE MAHAWELI DEVELOPMENT PROJECT (Before Accelerated Mahaweli Development programme)


C PARKER, Henry PARKER, Henry
Irrigation in the Northern province: report on the Iratperiyakulam-aru valley; Vavuniya, vilankulam district, 1886. 10P.
001/PRE
Key Words: Pre mahaweli project; Nothern Province irrigation

P DICKINSON, Philip P
River basin planning for Ceylon: the mahaweli Ganga basin. Uunited States Operation Mission
Colombo 1957 26p. 002/PRE
Key Words: pre mahaweli project USO Mission

P PFEIFER, Hans Peter
Report on a power development program for Ceylon 1958 78
maps;drawings
003/PRE
Key Words: Pre mahaweli project


IRRIGATION DEPARTMENT: Mahaweli River Basin Development Office
Mahaweli ganga diversion scheme : interim report; vol.1/ by Irrigation Department:Colombo, p.108; plans;diagrs;maps
004/PRE
Key Words: Pre mahaweli project river basin development


IRRIGATION DEPARTMENT/ USO MISSION
Irrigation Department USO Mission Mahaweli ganga basin development vol.1: transbas in diversion scheme: feasibility of development ^nMinistry of Agriculture, Land,Irrigation and Power 1961 71p.
005/PRE IRRIGATION DEPARTMENT: Mahaweli River Basin Development Office
Key Words: Pre mahaweli project

HUNTINGS Hunting Survey
Corporation Ltd The Surveyor General of Ceylon A report on a survey of the r
esources of the mahaweli ganga basin Ceylon: part 1962 v.p. A Canada-Ceylon Colo
mbo Plan project 006/PRE
Key Words: HUNTINGS pre mahaweli project

THE SURVEYOR GENERAL OF CEYLON
A report on a survey of the resources of the mahaweli ganga basin Ceylon: part II: appendices 1962 p.225;flow charts; maps; differential mass curve sheets
007/PRE
Key Words: HUNTINGS

UNITED NATIONS SPECIAL FUND
Request from the Government of Ceylon to the United National special fund for the development of the dry zone of Ceylon with particular reference to the mahaweli ganga project, 1963.29p.
008/PRE
Key Words: UNITED NATIONS SPECIAL FUND; pre mahaweli project; UN Special Fund; loan dry zone development

DESAI, S C DESAI, S C
A report on the re organisation of the hydraulics section; Irrigation Department: central hydraulic engineering research station;
Irrigation Department, Colombo. 1967
009/PRE
Key Words: Pre mahaweli project

ENGINEERING CONSULTANTS, INC
Agreement between the Government of Ceylon and Engineering Consultants, Inc for Consulting Engineering services for the Polgolla-Kala oya diversion scheme, 1968. v.p
010/PRE
Key Words: RE ENGINEERING CONSULTANTS, INC; pre mahaweli project; Polgolla- Kala Oya agreement


UNDP/FAO UNDP
FAO Mahaweli ganga irrigation and hydro-power survey: stage 1; vol. III: soil 1966 UNDP/FAO project 198?
/CEY/LA)
011/PRE
Key Words: UNDP/FAO; pre mahaweli project; soil survey

UNDP/FAO
FAO Mahaweli ganga irrigation and hydro-power survey ceylon: general report; vol.I 196? 217p.
012/PRE
Key Words: UNDP/FAO; pre mahaweli project mahaweli project area; settlement data 1968(207p.); early data mahaweli

UNDP/FAO
FAO Mahaweli ganga irrigation and hydropower survey Ceylon; final report; vol.I_III ;draft;( vol.I; general report : vol.II: feasibility report for phase I of development: vol.III; organizational and management requirements) (bound 3 volumes); FAO, 1968. 134p. (120,61,92,68); annexes; drawings; appendixes
FAO/SF:55/CEY-7
013/PRE
Key Words: UNDP/FAO; pre mahaweli project; final report 1968 FAO; FAO final report 1968

FAO
Mahaweli ganga irrigation and hydro-power survey; special report; vol.I: water resources administration and legislation in ceylon FAO 1968 45 UNDP/FAO project 198 CEY/LA
014/PRE
Key Words: FAO; pre mahaweli project


FAO:IRRIGATION DEPARTMENT HAMAMORIA
Mahaweli ganga irrigation and hydropower survey ceylon.: vol.II: climate & hydrology 1968. 151p.; annexes
UNDP/FAO Project 198 CEY/LA
015/PRE
Key Words: FAO:IRRIGATION DEPARTMENT; pre mahaweli project


Ponnusamy, S: Panabokke, C R


Mahaweli ganga irrigation and hydropower survey ceylon: stage I : vol.III: soils: stage II; the detailed reconnaissance soil survey and land use recommendations of area H; Kala oya basin 1968 76. 10p.; data
016/PRE
Key Words: FAO; IRRIGATION DEPARTMENT; pre mahaweli project; system H; Kala Oya basin; land use recommendations UNDP/FAO project 198/CEY/LA


ROZHIN, A V: SITHAMPARAPILLAI, P M
Mahaweli ganga irrigation and hydropower survey ceylon: stage
II: vol.IV; engineering geology, 1968
017/PRE
Key Words: FAO; pre mahaweli project; engineering geology

SHUVAEV, G A SATGUNASINGAM, K
Mahaweli ganga irrigation and hydropower survey ceylon:
stage I & II; vol.V: water management, 1968. 108p.; appendices. UNDP/FAO Project198/CEY/LA
018/PRE
Key Words: FAO; pre mahaweli project; water management

UNDP/FAO: KIMURA, T
Mahaweli ganga irrigation and hydropower survey ceylon: stage I, II&III : vol.VI;Irrigation; FAO &Irrigation Dept. Colombo, 1968 361p.; plans; maps; figures
019/PRE
Key Words: UNDP; FAO; Pre mahaweli project; Irrigation Department

FAO/UNDP:AGALAKOV, S S
Mahaweli ganga irrigation and hydropower survey ceylon:vil.VII; dams and hydro electric stations. FAO;Irrigation Dept., Colombo.1968
217p.; tables
UNDP/FAO project 198/CEY/LA
020/PRE
Key Words: FAO/UNDP; pre mahaweli project; dams; hydro electric stations

FAO/UNDP: RAM,K V
Sri Mahaweli ganga irrigation and hydropower survey Ceylon; stage II: vol.V
III (A): agricultural economics. FAO:Irrigation Dept, Colombo, 1968.
171p.
UNDP/FAO project 198/CEY/LA
021/PRE
Key Words: Pre mahaweli project; agricultural economics; early settlement

FAO/UNDP RAM, K V
Sri Mahaweli ganga irrigation and hydropower survey:stage II; vol.VIII (B): agricultural economics
FAO:Irrigation Dept, Colombo 1968, 134p.
022/PRE
Key Words: FAO/UNDP; pre mahaweli project; agricultural economics

FAO/UNDP: AKSEL, E
Mahaweli ganga irrigation and hydropower survey ceylon; stage II: vol.IX; hydro-power; FAO:Irrigation Dept: Colombo, 1968. 143p.
UNDP/FAO Project 198/CEY/LA 023/PRE FAO/UNDP; pre mahaweli project; hydro power

FAO
Mahaweli ganga irrigation and hydropower survey ceylon....vol. X. 1968
024/PRE (not available)
Key Words: FAO; pre mahaweli project

FAO/UNDP: BARNABAS, A P
Mahaweli ganga irrigation and hydropower survey ; stage II: vol.XI: sociological aspects 1968
UNDP/FAO Project 198/CEY/LA
025/MAH
Key Words: FAO/UNDP; pre mahaweli project; sociologic
al aspects

FAO/UNDP
Mahaweli ganga irrigation and hydropower survey : Vol.XII; Forestry and forest land use, 1968. 60p.
UNDP/FAO Project 198/CEY/LA
026/PRE
Key Words: FAO/UNDP: pre mahaweli project: forest land use


UNDP/FAO: FIALKOCSKY, Dr.P G
Mahaweli Ganga irrigation and hydro power survey; stage II: final general report part II: final feasibility report for phase I of development, 1968
150p.; appendices
UNDP/FAO Project 198/CEY/LA
027/PRE
Key Words: UNDP/FAO pre mahaweli project

FAO/UNDP WIRTZ, H A
A M Mahaweli ganga irrigation and hydropower survey; vol.XIV: agricultural aspect, 1969. 33p.
028/PRE
Key Words: FAO/UNDP project; pre mahaweli project; agricultural aspect

HUNTINGS/THE SURVEYOR GENERAL OF CEYLON
A report on a survey of the resources of the mahaweli ganga basin Ceylon
:part I: text, 1962.
252p.
029/PRE
Key Words: pre mahaweli project; survey of mahaweli; geology map; A Canada-Ceylon Colombo Plan project

HUNTINGS
A report on a survey of the resources of the mahaweli ganga basin Ceylon: pa
rt II: appendices,1962.
030/PRE
Key Words: HUNTINGS; pre mahaweli project

FAO/UNDP
Mahaweli ganga irrigation and hydro-power survey ceylon: interim report: summary, FAO, Colombo. 1967.
031/PRE FAO/UNDP
Key Words: pre mahaweli project; interim report

Ministry of Irrigation, Power and Highways: Mahaweli Dev
Elopement Board
Mahaweli ganga development project I: Bowatenna hydro-power unit: MDB. Colombo, 1972.
032/PRE
Key Words: Ministry of Irrigation, Power and Highways: Mahaweli
Development Board; pre mahaweli project

UNDP/FAO
Mahaweli ganga Irrigation and hydropower survey
Ceylon: final report: vol.II: feasibility report for phase I of development, 1969.
FAO/SF:55/CEY-7
033/PRE
Key Words: UNDP/FAO; pre mahaweli project

UNDP/FAO
Mahaweli ganga Irrigation and hydropower survey Ceylon: final report: vol.III: Organizational and management requirements, 1969.
034/PRE
Key Words: UNDP/FAO pre mahaweli project

SRI LANKA: Ministry of Irrigation, Power and Highways
Final report of the 1970 commit
tee of inquiry into the mahaweli ganga development project, 1970.
035/PRE
Key Words: SRI LANKA: Ministry of Irrigation, Power and Highways; pre mahaweli project

SOGREAH SOGREAH
Mahaweli ganga development project I; phase
I: review report: MDB, 1971.
036/PRE
Key Words: SOGREAH; pre mahaweli project

SOGREAH SOGREAH Mahaweli ganga development project I: phase I
I: feasibility report ; vol.I (sinhala). Mahaweli Development Board: Colombo, 1972.
037/PRE
Key Words: SOGREAH; pre mahaweli project

SOGREAH: UNDP/FAO
Mahaweli ganga irrigation a
nd hydro-power survey Ceylon: Vol.I; water resources administration and legislation in Ceylon, 1968
038/PRE
Key Words: SOGREAH;pre mahaweli project; water resources

UNDP/FAO
Mahaweli ganga Irrigation and hydro-power survey Ceylon: vol.II: summary and economic evaluation; phase I; Ad Hoc Report, 1968
039/PRE
Key Words: UNDP/FAO; pre mahaweli project; ad hoc report

UNDP/FAO
Recommendations of the programming mission for socio economic studies and planning relating to mahaweli development: UNDP Colombo, 1978.
UNDP Mission report
040/PRE
Key Words: UNDP/FAO; pre mahaweli project; UNDP Mission report

SOGREAH/MDB
Mahaweli ganga development project I: feasibility report for stage II: Vol.V; engineering report (vol.V of VIII) MDB: Colombo, 1972
184p. 041/PRE
Key Words: pre mahaweli project; engineering report; feasibility report


SOGREAH
Re consultant Mahaweli ganga development project I; feasibility study for stage II: vol.VII; settlement planning and development (vol.VII of VIII)
MDB, Colombo, 1972
201 042/PRE
SOGREAH; pre mahaweli project; settlement planning

SOGREAH/MDB
Mahaweli ganga development project I: feasibility study for stage II: vol.VIII; marketing and credit (vol.VIII of VIII), 1972
67 043/PRE
Key Words: SOGREAH/MDB; pre mahaweli project; marketing and credit

SOGREAH
Mahaweli ganga development project I: electro-mechanical equipment for Polgolla diversion unit; specifications; vol.I; general conditions (vol.I of IV) contracts PS6 and PS7, 1972
044/PRE
SOGREAH; pre mahaweli project; Polgolla diversion

SIR WILLIAM HALCROW & PARTNERS
Bowatenna power project: appraisal report, 1973
045/PRE
Key Words: pre mahaweli project; Bowatenna power project

UNDP/FAO
Mahaweli development proposals: master plan and plan of development & cost
estimates of Polgolla diversion project stages I & II 1975 62;79;127;153p.(bound
volumes)
046/PRE
Key Words: UNDP/FAO; pre mahaweli project master plan mahaweli; land development; Kalawewa; Kandalama

SOGREAH SOGREAH
Mahaweli ganga development project I: electro-mechanical equipment for Polgolla diversion unit; specificatios; vol.II Bid and delivery schedules (Vol.II of IV), 1972. v.p.
047/PRE
SOGREAH; pre mahaweli project; Polgolla diversion

SOGREAH
Note about the planning and economic studies in relation to the mahaweli ganga development programme 1979 27
048/PRE
Key Words: pre mahaweli project; economic and planning studies


SRI LANKA: Ministry of Irrigation, Power and Highways
Minutes on Committee of inquiry (1970): the mahaweli ganga development project; the gas turbine project; the Ceylon Highway development project : conference held on the 5th June, 1970
049/PRE
Key Words: pre mahaweli project; gas turbine project; highway development project

UNICO INTERNATIONAL CORPORATION
Survey report on industrial development at mahaweli ganga project area, 1973
455 050/PRE
Key Words: UNICO INTERNATIONAL CORPORATION; pre mahaweli project; industrial development mahaweli; Overseas Technical Cooperation Agency Japan

MAHAWELI DEVELOPMENT BOARD
Mahaweli ganga development project 1: feasibility report for stage III
A; engineering report, 1976
59p; maps;drawings
051/PRE
Key Words: MAHAWELI DEVELOPMENT BOARD; pre mahaweli project; engineering report

WEATHERLY, W Paul: Arnold, John H
Environmental assessment of stage II of the Mahaweli
ganga development project: USAID, 1977
177 052/PRE
Key Words: pre mahaweli project USAID environment mahaweli

MAHAWELI DEVELOPMENT BOARD
Mahaweli Development Board Mahaweli ganga development: summary reports on projects, 1977
42p. maps;data
053/PRE
Key Words: MAHAWELI DEVELOPMENT BOARD: pre mahaweli project summary report on project


JANSEN, Dr.W H
An analysis of social factors affecting the mahaweli ganga development project 1977 47
054/PRE
Key Words: pre mahaweli project; US AID; socio cultural mahaweli

FAO/IBRD
WORLD BANK Report of the Ce
ylon mahaweli ganga irrigation and power project: FAO/IBRD preparation mission 1
968 25p. Report No.11/68 Ceylon 4 055/PRE FAO/IBRD pre mahaweli project World b
ank publication

CEYLON TOBACCO CO.LTD
Preliminary report: the management of 5,000 acres of land in the mahaweli basin (1981) 18p
056/PRE
CEYLON TOBACCO CO.LTD-; pre mahaweli project

CENTRAL BANK OF CEYLON: Dept.of Economic Research
Report on the sample survey of economic conditions in the mahaweli development area:1974. Central Bank of Ceylon, 1975. 96p.; appendices
057/PRE


CENTRAL BANK OF CEYLON: Dept. of Economic Research
Key words: Pre mahaweli project; economic conditions in mahaweli; mahaweli area development;area development mahaweli; sample survey report

JOGARATNAM, T
Report of the re-survey of the Elahera Colonization scheme in Ceylon, 1971. 32p.
058/PRE
Key Words: Pre mahaweli project; colonization scheme

 

 


About Us | History | Projects | Divitions | Systems | Agriculture | Statistics | Publications
 
 
 